SegAudit
Frameworks

Findings in the language your auditors use.

After every segmentation assessment comes the question: what does it mean for our framework? SegAudit answers control by control, from the same firewall evidence as the findings, and says what closes each gap.

Which fits your work?

Compliance crosswalk showing each framework and its controls marked supported, partial or gap

How a control is judged

Each control the firewall evidence can speak to gets one of three verdicts, with the evidence behind it.

Supported

The firewall evidence supports the control, and the crosswalk shows it.

Partial

Some evidence is there, or it comes from a draft such as the asset inventory or conduit worksheet that the site teamthe clientyour team still has to confirm and maintain.

Gap

The firewall evidence shows a gap. Each gap says what closes it and links to the change package, remote access review or asset inventory.

Controls in the crosswalk

FrameworkControls judged from the evidence
IEC 62443-3-39 controls
NIST CSF 2.010 controls
NIST SP 800-171 Rev. 2 / CMMC Level 211 controls
ISO/IEC 27001:2022 Annex A7 controls
NIS2 Article 21(2)6 controls

The control-by-control list for each framework is in the customer guides.

Sector frameworks

Five sector and national rules, judged the same way, with the status after the change package.

FrameworkWho it applies toControls judged from the evidence
NERC CIP-005-7 / CIP-007-6Electric utilities9 controls
TSA security directivesPipelines (SD Pipeline-2021-02G) and rail (SD 1580/82-2022-01E)5 controls
EPA water checklistDrinking water and wastewater systems11 controls
US Coast Guard, 33 CFR 101.650Ports, terminals, vessels and offshore facilities11 controls
UK NCSC CAF 4.0UK operators of essential services9 controls

Only when it appliesOnly when the client answers to itOnly when your sites answer to it

Sector frameworks stay off the Compliance page and the report until you turn one on there.Sector frameworks stay off the Compliance page, report and deliverables pack until you turn one on for the client: on the Compliance page, under the letterhead or as a firm profile default.Sector frameworks stay off the Compliance page, report and handoff until you turn one on there.

NERC CIP reads the zone model

OT zones are read as the Electronic Security Perimeter and the firewall at their boundary as its Electronic Access Points. CIP-007 R2 and R4.1 are partial at best, because patching and login events are in each Cyber Asset's own records. A CIP-005 R1.3 report lists each permission at an access point with its reason, and the ones missing one.

TSA segmentation uses isolation readiness

The directives ask that OT keeps running if IT is compromised. Each site's isolation readiness is the evidence.

Dates that matter

Coast Guard segmentation is due on 2027-07-16. CIP-005-8 and CIP-007-7.1 take effect on 2028-07-01. Confirm the versions in force for the audit period.

Beyond the crosswalk

IEC 62443-3-2 worksheet
Each observed conduit with its zones, the SL-T the asset owner assigned (SL-2 assumed where none is set), the traffic behind it and the proposed fix. Exports as markdown or CSV.
Purdue model
Each zone sits on the Purdue level you confirm (L0 to L5, with the L3.5 IDMZ); paths that skip an adjacent level, which NIST SP 800-82r3 recommends against, become findings.
App-ID matrix (SR 5.2)
Expected and restricted applications for each hop, editable per audit.Expected and restricted applications for each hop, editable per engagement.Expected and restricted applications for each hop, editable per audit.
NIST SP 800-82r3 overlay
The audit report can restate each finding against the SP 800-53 controls in the SP 800-82r3 OT overlay, such as SC-7 and AC-4. Untick it for an IEC-only report.
MITRE ATT&CK for ICS
Each technique the evidence leaves open, in attack order, with the evidence and the fix. Only techniques a rulebase and its traffic can speak to are listed.
CMMC Specialized Assets
At Level 2, OT is a Specialized Asset under 32 CFR 170.19(c). The asset inventory and the zone map supply two of the four things an assessor looks for.
Audit report with the NIST 800-82r3 overlay toggle, Print and Export above the executive summary
The audit report, with the optional NIST SP 800-82r3 overlay.

What it does not claim

  • Not a certificationSegAudit helps you assess segmentation controls. It does not certify compliance with any framework.
  • Firewall evidence onlyMost controls also need process and documentation evidence that a firewall config and traffic log cannot provide.
  • Some controls need Device-IDControls marked * are judged only when Device-ID reports operating systems, so an end-of-support OS can be spotted.
  • Drafts stay partialAnything the tool drafts counts as partial, never supported, until the site team confirms it.Anything the tool drafts for the client counts as partial, never supported, until the client confirms it.Anything the tool drafts counts as partial, never supported, until your team confirms it.
  • Your observations count against itAn observation you record on a control holds it at partial, or gap when it is critical or high. The change package does not close it.

Common questions

Can our framework come first?Can the client's framework come first?Can our framework come first?

Yes. Pick them on the Compliance page.Yes. Pick them in the letterhead, or set your usual ones in the firm profile.Yes. Pick them on the Compliance page. The brief summarizes each, the crosswalk lists them first, and the report leads with them.

Does it show the effect of the fix?

Yes. Each control also shows its status after the change package is implemented and verified, and why, so you see which gaps it closes and which need more work.

Can we track it over time?

A checkpoint at the end of each assessment freezes the gaps in every framework, so the next quarter shows the movement.A checkpoint at the end of each assessment freezes the gaps in every framework, so the next quarter shows movement in the client's own framework.A checkpoint at the end of each quarter's audit freezes the gaps in every framework, so the next quarter shows the movement.

How do I get it out?

Export the crosswalk as markdown or CSV from its page. The audit report carries a summary.Export the crosswalk as markdown or CSV from its page. The audit report carries a summary, and the deliverables pack includes it in Word, markdown and CSV.Export the crosswalk as markdown or CSV from its page. The audit report carries a summary, and the all-sites handoff includes it in Word, markdown and CSV.

See how consultants and asset owners use the crosswalk, or read about the company's own status in the trust center.